Work is now almost finished on the remodelling of the main school building. The floor is down. We have installed expanded polystyrene in the external walls so as to reduce the noise level from the main highway. The main entrance will now be at the far end of the building with a more ample entrance area. Security and class room privacy will be better since we have installed new doors for that purpose. The new auditorium space benefits also from new windows fitted so as to reduce external noise as much as possible. Rewiring has been done to take into account the suspended ceiling that remains to be installed. After that, still to be completed will be hanging the new doors and to decorate. Classes start on Monday, February 2nd, so we will have a busy weekend. Thank you again to everyone who has made this work possible and which will greatly enhance the educational experience at our centre for our music and dance education students and for our adult secondary education students.
|
Juan Cruz finishes off the flooring |
Felix Pedro Hernandez lays concrete in the new entrance area |
|
the new main door entrance |
a new, more ample storage space |
|
installing the walls |
the walls with the new window reveals |
|
the new external wall with windows and secondary entrance |
a view from the new main entrance |
|
access to the new main entrance |
ceramic tiles over the main entrance to the auditorium |









